DETAILED ENVIRONMENTAL PLAN FOR THE "RUNATULLO II AND RUNATULLO III HYDROELECTRIC POWER PLANTS" PROJECT

EGE Junín makes available to the population of the area of influence of the "Runatullo II and Runatullo III Hydroelectric Power Plants" project (hereinafter "CH Runatullo") the file of the Detailed Environmental Plan (PAD) so that they can have access to it for the contribution of suggestions, comments or observations, during the ten (10) calendar days of publication of the notices, from February 6 to 16, 2023, through the form indicated below, which should be sent to the following e-mail address: consultas_dgaae@minen.gob.pe

The objective of the presentation of the Runatullo HPP is to adapt the facilities for the ongoing hydroelectric generation activity with respect to the environmental obligations and regulations in force.

The complete physical document of the Runatullo CH PAD and the comments form can be found at the local community office or online at the following links.

Download link of the virtual document PAD Runatullo with Registration No. 3423355: http://www.minem.gob.pe/descripcion.php?idSector=21&idTitular=9310

Virtual download link of the PAD directly from Drive: https://drive.google.com/file/d/1T0neJvW7FoLWMHFWwUXX0dtHlzC95Y9Y/view?usp=share_link

Link to download the comments and contributions form to be sent to the indicated e-mail address: http://www.minem.gob.pe/minem/archivos/FORMATO%20PAD%20C_H%20%20RUNATULLO.pdf

en_USEN