Information
Hydroelectric plant located in the peruvian department of Junín, between the mountains and amazon jungle of Perú, in the central area of the Andes, at 2,365 meters above sea level. With a gross drop of 187 meters and 2 Francis Horizontal turbines, they guarantee a total capacity of 10.0 MW, connecting directly to the Husasahuasi 2 substation through a 2 km long transmission line.
Location
PERUVIAN DEPARTMENT OF JUNÍN, BETWEEN THE MOUNTAINS AND AMAZON JUNGLE OF PERÚ, IN THE CENTRAL AREA OF THE ANDES.
LAP Capacity
6,6 MW
Operated since
FEBRUARY 2009
