Run-of-river plant located downstream of Huasahuasi 1, at 2,175 meters above sea level.

With a gross drop of 185 meters and 2 Francis Horizontal turbines, they guarantee a total capacity of 10,0 MV, connecting the line of Ninantambo- Chanchamayo through a 2 km long transmission line.

Location

PERUVIAN DEPARTMENT OF JUNÍN, BETWEEN THE MOUNTAINS AND AMAZON JUNGLE OF PERÚ, IN THE CENTRAL AREA OF THE ANDES.

LAP Capacity

6,6 MW

Operated since

FEBRUARY 2009