Information
Hydroelectric plant located in the peruvian department of Junín, 3.147 meters above the sea level. With a gross drop of 329 meters and 2 Pelton Vertical turbines, they guarantee a total capacity of 20,0 MV, connecting directly to the Runatullo 3 substation through a 3,5 km long transmission line and 60kV transmission voltage.
Location
THE PERUVIAN DEPARTMENT OF JUNÍN, 3.147 METERS ABOVE THE SEA LEVEL.
LAP Capacity
14 MW
Operated since
DECEMBER 2014
