Information
Eolic Park that began its development in 2012, after more than 5 years of wind measurements. Its construction began in the first half of 2015 and construction and commissioning were completed in December 2016. In March 2017, was achieved the commercial operation by CDEC.
With a total capacity of 193,2 MW guaranteed by the implementation of 56 Vestas wind turbines, V117;3,45 MW Model. The distance from the transmission line to the SIC (Punta Colorada) is 83.6 km.
http://www.parquesanjuan.com
Location
III REGION OF ATACAMA, IN THE SEASIDE AREA, AT THE COMMUNE OF FREIRINA SOUTH, PROVINCE OF VALLENAR, APPROXIMATELY 60 KM TO THE SOUTH OF THE PORT OF HUASCO AND 55 KM IN A STRAIGHT-LINE WEST OF THE CENTRAL INTERCONNECTED SYSTEM, SIC
LAP Capacity
193,2 MW
Operated since
DECEMBER 2016.
COMMERCIAL OPERATION- CDEC MARCH/2017
