The Santa Cruz 1 hydroelectric plant has been operating since February 2009 in the Peruvian department of Ancash, northeast of Lima, at 2,013 meters above sea level, in the Blanco River basin (Santa Cruz), downstream from the Santa Cruz 2 plant.

It has a total installed capacity of 6.0 MW and feeds the National Interconnected Electric System (SEIN) through a 2 km long transmission line.

Location

ANCASH – LIMA

LAP Capacity

3,9 MW

Operated since

FEBRUARY 2009