Information
Hydroelectric plant located in the peruvian department of Ancash, northeast of Lima, upstream of the Santa Cruz 1 central, at 2.121 above the sea level, in the Blanco River basin (Santa Cruz).
With a gross drop of 119 meters and 2 Francis Horizontal turbines, they guarantee a total capacity of 7.4 MW, connecting to the Santa Cruz 1 substation by a transmission line 2 km long and with a voltage of 60 kV.
Location
ANCASH – LIMA
LAP Capacity
4.9 MW
Operated since
FEBRUARY 2009
